Before removal
Establish ownership, asset inventory, condition baseline, included equipment, professional responsibilities, site access, safety plan, weather window, and storage/transport sequence. Photographs and labels help preserve component traceability.
A buyer should avoid committing to an assumed timeline until the asset, seller obligations, receiving site, and permit route have been reviewed.
During removal and transport
The team needs a method for controlled deflation or shutdown, safe handling, cleaning and packing of fabric and components, loading, and documented handoff. Specialized contractors should direct the work.
Transport considerations include shipment dimensions, handling equipment, routes, insurance, storage conditions, and the point at which responsibility transfers.
At the new site
Reinstallation is tied to the receiving site’s engineered and permitted condition. It may include retention/anchoring work, utilities, mechanical/electrical interfaces, doors, safety systems, inflation, testing, and operating preparation.
For this asset, consult the relocation overview and request information about the Farmingdale dome.